As of 10/13/2010 the daily output totaled 827.6 thousand t.
The aggregate figure comprises 255.5 thousand t extracted from mines and 664.5 thousand t of dug coal.
Pechorsk basin produced 37.2 thousand t, Donetsk basin—10.7 thousand t, Kuznetsk basin—508.3 thousand t, Kansk—Achinsk basin—123.9 thousand t.