The mine operations were suspended on 10/20.
In the second half-year of 2010, Raspadskaya planned to produce 2.5 m t of coal, 3Q2010 output totaling 1.11 m t.
MUK–96 current annual capacity equals c 2 m t of GZh-graded coal (in Russian classification).