news on metcoal.ru: print version
01.04.2011 SDS Ugol’ invests 16 m roubles to construct coal loading terminal


The facility at the coal depot of Dzerzhinsky Mine in Prokop’evsk was set up in three months,

including construction of new coal-conveying plant, bunker, pipeline and electrical equipment.

A breaking plant was mounted as well solving the coal grading problem and allowing to supply required coal grades for concentrating needs.


Source:   metcoal.ru