news on metcoal.ru: print version
07.10.2011 Raspadskaya launches new long-face


The new long-wall face features 1.4 m t of coal reserves with c 150 thousand t to be produced monthly at the first stage of operations.

KM-142 complex was mounted in the course of preparatory works at the long-face.

The coal from the face will be transported to Raspadskaya concentrator by belt transporters.


Source:   metcoal.ru