The new long-wall face features 1.4 m t of coal reserves with c 150 thousand t to be produced monthly at the first stage of operations.
KM-142 complex was mounted in the course of preparatory works at the long-face.
The coal from the face will be transported to Raspadskaya concentrator by belt transporters.