It should reach 10.7 m t, Gennadiy Kozovoy (Raspadskaya, CEO) says.
The total of 2011 output is expected at 6.4-m-t level, he maintains.
Four and a half million t will be extracted at Raspadskaya mine, 2 m t — at MUK 96 mine, 3.2 m t — at Raspadskiy open-pit, 1 m t — at Koksovaya mine.