Evraz ZSMK estimates the costs of transfering its furnaces to pulverized coal at 4.8 bn roubles
The figure was announced by Alexei Yuryev (Evraz ZSMK, managing director). Such technological transfer would ensure 50 per cent reduction of natural gas consumption by the enterprise although the gas will still be used in other production processes.