news on metcoal.ru: print version
05.05.2012 New long-face at Raspadskaya


On 05/03/2012, the first stage 2.5-m-t long-face 4-9-23 was commissioned.

The long-face is equipped with Busyrus mining set, 7LS1A JOY shearer, and PF/1032 face conveyer.

The coal is transported to concentrating plant by belt conveyors.


Source:   metcoal.ru