The group plans to step up finished cast iron production reaching 1.4 m t in 2012, 1.5 m t annually—in 2013–16.
Also, it intends to increase the output of rolled section steel from .1 m t to .2 m t annually in 2012–16.
The annual coke production is to grow from 2.6 m t (2011) up to 2.7 m t in 2012–16. In 2012–13, c $46 m will be invested into the chemical-recovery plants modernization.